Anchoring to the base
The enclosed dowels must be used for anchoring (6 x Hilti HKD-ER compact dowels M8x30).
Specifications for compact dowels Hilti
HKD-ER M8x30 (Source: Hilti)
Making drillholes
Mark the 6 holes on the concrete foundation using the baseplate of the floor-mounted
column.
Make sure that the connection cable is located precisely underneath the opening in the
baseplate.
Drill the 6 mounting holes:
Diameter: 10 mm
Drill-hole depth: 33 mm
Hammer the enclosed dowels using the Hilti HSD-G manual setting tool (not included
in the scope of delivery) so that they are flush with the floor.
Hilti HSD-G manual setting tool (Source: Hilti)
Please also observe the following instructions:
Instructions on inserting the dowels (Source: Hilti)
14
Anchorage ground
Recommended load tension N
(uncracked concrete)
Transversal shear V per dowel
(uncracked concrete)
Required clearance
Drill-hole diameter
1
Drill-hole depth
2
Torque
3
Floor-mounted column – Installation Manual, v4.00, 90333
Technical data
Standard concrete with a strength
class of C20/25-C50/60 or greater
4 kN
3,9 kN
10,5 cm
10 mm
33 mm
≥8 Nm