OVEN INSTALLATION
1. After removing the outer shipping carton and packaging
material, place the oven on the floor or other flat surface.
2. Open oven and remove any instructions or packaging
material shipped inside the unit.
3. For the Double Oven, lift up the front of the oven and attach the
two front legs (packed separately in styrofoam), carefully twisting
each one into a corner and hand-tightening. Lift
the back of the oven and attach the two back legs
and hand-tighten.
4. Move the oven to its final location. For Double
Oven, adjust the bottom portion of the legs to
level the unit (fig. 1).
PIZZA CERAMIC DECK INSTALLATION
& CONDITIONING
Read these instructions carefully before installing or
conditioning the ceramic deck. New deck must be conditioned
(pre-dried) prior to first use.
• Handling the Ceramic Deck: If deck is struck against hard
surface before, during or after installation, it can develop a full
or hairline crack which may expand over time and require you to
replace it.
• Installing the Deck: Open the
oven door and place ceramic
pizza deck into the bottom
with the slot on front of
deck facing front of oven.
Be sure the deck is firmly
set in place. Do not force or
wedge it (fig. 2).
• Conditioning the Deck: Pre-dry ceramic deck by carefully
following instructions in the following section, BEFORE USING YOUR
PIZZA OVEN. NOTE: Failure to follow conditioning instructions
will cause deck to crack or warp and will void warranty.
9
(fig. 1)
SLOT
(fig. 2)