Haier GE AB09SC2VHA Instrucciones De Instalación página 6

Ocultar thumbs Ver también para GE AB09SC2VHA:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions: List of Materials
Required Tools for Installation
• 17mm, 22mm, 26mm or Adjustable Wrench
• #2 Phillips Screwdriver
• Drill
• 45° Flaring Tool
• Hex Wrench
• Hole Saw 2 ¾"
• Level
• Manifold Gauge
• Measuring Tape
• Micron Gauge
• Mini-Split Adapter (5/16"F to 1/4"M)
• Condensate connecting tube
• Clamp
• Flare nuts
Model
AB09SC2VHA
AB12SC2VHA
AB18SC2VHA
6
Supplied with Unit
Supplied by Installer
Liquid (inch)
Vapor (inch)
1/4
3/8
1/4
3/8
1/4
1/2
• Nitrogen*
• Pipe Cutter
• Razor Knife
• Reamer
• Sealant, non-expanding (for lineset hole)
• Soap/water solution or gas leakage detector
• Stud Finder
• Torque Wrench
• Vacuum Pump
• Wire Strippers
• YR-HG remote (batteries included)
• Insulation
• Mounting Template
• Insulated copper tubing
• 14/4 (14 gauge – 4 conductor) stranded cable
• 3/4 inch PVC for condensate
• Insulation for condensate drain
• 3/8 threaded rod, washers and nuts
• 410A Refrigerant
31-5000098 Rev. 0

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ge ab12sc2vhaGe ab18sc2vha

Tabla de contenido