13
initial check
Note
i
An initial check must be performed in accordance with local and national regulations before the
commissioning wizard is started. More information on the individual steps can be found in the
Commissioning instructions for circuit monitoring.
Perform initial check
14
Running the commissioning wizard
Note
i
Once the mains fuse provided on site is closed, the ONLITE central eBox CPU is provided with
power, the eBox system is locked and the commissioning wizard starts automatically on the display.
The basic settings for the eBox system are defined here.More information on the steps and setting
options provided by the commissioning wizard can be found in the Commissioning instructions
for circuit monitoring.
Run the commissioning wizard
15
Testing the installation
1. Select Commissioning > Installation test on the display.
Ü
The Installation test view is displayed.
2. Check whether installation errors have been reported by the eBox system.
(Installation faults)
3. Ensure that the emergency luminaires are connected to the right output circuit and are properly functioning.
(Locate luminaires)
4. If errors must be resolved, lock the eBox system.
(Lock system)
Ü
eBox system is locked.
5. Remove plug DC out from the recharging device.
Ü
The power to the output circuits is disconnected.
6. Resolve the error.
7. Insert plug DC out into the recharging device.
Ü
The voltage supply is reconnected.
8. Unlock the eBox system via the display.
(Unlock)
Test installation
ONLITE central eBox, Quick commissioning 3.0 | 03.2019 | en
initial check
EN
Done
Done
Complete
31