NOTICE
Install the cable/conduit connector with
the arrow pointing towards the flow control, as shown
in the figures.
6. Route supply wires through the flexible conduit fitting into the
wiring chamber of the flow control.
7.
Connect the supply ground wires to the ground lug in the
wiring compartment.
NOTICE
The safety earth ground connection is
marked at its terminal using the
8. Connect the supply wires to the screw terminals marked
L and N (Figure 7). Use only copper wires rated for at
least 60 °C. Lead wire terminals should be tightened
to a torque of 4 in-lbs (0.5 Nm).
9. Connect the motor wires to the screw terminals marked
U and V (Figure 7). Use only copper wires rated for at
least 60 °C. Lead wire terminals should be tightened
to a torque of 4 in-lbs (0.5 Nm).
10. Replace the cover and tighten the screws. For proper sealing, the
screws should be tightened to a torque of 13 in-lbs (1.5 Nm).
11. Once the cover has been replaced, ensure that the pump has
been correctly primed and reconnect the main breaker.
symbol (Figure 7).
NOTE: The components marked out with an X in Figures 3 and 4
are not used for that specific installation.
FOLLOW ARROW DIRECTION
To Controller
Wiring for Liquid-tight Cables
FOLLOW ARROW DIRECTION
To Controller
Wiring for Flexible Conduit
Electrical Diagram
115 VAC 50-60 Hz
230 VAC 50-60 Hz
To 1/2" NPT
Figure 5
Lead Input
Figure 6
L1
N/L2
115 VAC 50-60 Hz
230 VAC 50-60 Hz
Figure 7
7