Locating unit
A minimum of 305mm (12") to the left of the unit must be
unobstructed for service clearance (see dimensions
and clearances).
Leg extension accessory
1.
Raise unit off feet.
2. Remove each standard foot channel with four carriage bolts
(Fig. 11.1).
3. Remove foot insert and cap insert from standard foot
channel.
4. Align each accessory extension foot channel to the eight
holes of leg.
5. Use the four carriage bolts removed in step 2 and four
carriage bolts supplied with leg extension accessory to
attach each extension channel to the eight holes of each leg
(Fig. 11.2).
6. Place foot insert and cap insert into extension foot channel.
7.
Verify each leg is in fully retracted position prior to lowering
unit on feet.
8. Follow leveling instructions below.
Leveling
Leveling the unit is important for the proper operation of any
top mounted icemaker. The dispenser is shipped with the legs in the
fully retracted position. Each leg may be adjusted independently by
turning clockwise to lower the leg or counterclockwise to raise
the leg.
Utility connections
Drain
Drain connection is made to the 1" FPT PVC fitting (Fig. 12).
Leave a minimum of 1cm per 31cm run (1/4" per foot) slope on
drain line run. Insulate the entire run length to prevent condensation
from forming on outside of drain line.
Note:
Avoid excessive tightening force when connecting
to this fitting.
Note:
Do not apply excessive heat if any sweating of fittings is
necessary. Heat conduction through metal may melt
threads in plastic drain.
Electrical
Make electrical connections in accordance with local and NEC
codes. Each icemaker and dispenser requires separate circuit.
Equipment ground required.
Standard electrical – 230V, 50 Hz, 1 phase. Max. fuse – 5 amps,
15 amp circuit. Cord provided.
Foot pedal
The foot pedal is connected to the dispenser at the factory. Remove
packaging and place on floor near bag stand on front of dispenser.
Fig. 11
1
Fig. 12
226mm
(8.875")
11
1
2
1
582mm
drain
(22.875")
2
2