Wet/Dry Vac Assembly
1. Line up vacuum port in lid with drain
cap located on the front of the drum.
2. Place lid on top of drum with the drum
latches snug against the drum
channel.
3. Be sure lid completely covers the top
of the drum so leakage does not
occur.
4. Push down on top of the drum latch
areas to cause the drum latches to
hook onto the drum channel.
NOTE: Some models may have rotating
latches. Rotate both latches down until
you hear them snap over the drum
channel.
5. Make sure that the locking tabs are
snapped in place to prevent the lid
from coming off.
Your new Wet/Dry Vac is ready for use.
Insert Hose
Insert the push button end of the
Tug-a-Long™ hose into the inlet of the
Vac. The hose should snap into place.
To remove the hose from the Vac, press
the release button in the hose assembly
and pull the hose out of the Vac inlet, as
shown.
Vacuum
Port
Drum
Channel
Drum
Latches
Drain Cap
6
Lid
Push
Down
Release Button