Air Connection; Extract Ventilation Rates; Typical Applications - Vortice VORT PENTA Manual De Instrucciones

Ocultar thumbs Ver también para VORT PENTA:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 13
ENGLISH
• Should the appliance be dropped or suffer a heavy
blow, have it checked immediately by Vortice.
• The appliance must be installed by professionally
qualified personnel.
• The electrical system to which the appliance is
connected must conform to applicable standards.
• The appliance is double insulated and therefore
does not need to be earthed.
• The electrical power supply/socket to which the
appliance is to be connected must be able to
provide the maximum electrical power required by
the appliance. If it cannot do so, arrange for a
qualified electrician to make the necessary
modifications.
• A multi-pole switch must be used to install the
appliance. The gap between the switch contacts
must be no less than 3 mm.
• Switch off the system's main switch:
appliance does not function correctly; b) before
cleaning the inside and outside of the appliance;
c) if you decide not to use the appliance for any
length of time.
• Maintenance/Cleaning: On a yearly basis, have
professionally qualified personnel check the level of
grime that has accumulated. If necessary, use a dry
cloth or a brush to clean the control components
and fan blades. Water should only be used to clean
the adjustment vents. Do not immerse the
appliance in water or other liquids.
• Check that the air intake section, situated towards
the outside, is clear.
• The flow of air or fumes to be carried outside must
be clean (that is free of grease, soot, chemical and
corrosive agents, and explosive or flammable
mixtures).
• The appliance must not be used to activate water
heaters, room heaters, etc. and it must not
discharge into the hot air ducts of such appliances.
• Keep the appliance's intake and outlet grilles free to
ensure an optimum flow of air.
• Specifications for the power supply must correspond
to the electrical data on data plate A (fig.5).

Air connection

The regulators for bathroom intakes
blanking plugs are fitted by pressing them onto the
fan casing and they are interchangeable. It is possible
to identify the two different regulator valves of the
regulators (15 m
3
/h or 30 m
The vents for the bathrooms, (
(
125) must be connected to the air extract
Ø
with ducts (use only 30m
These ducts must run as straight as possible, with a
a minimum length of 1.5 m of ducts for each extract.
Ensure the pipes are positioned correctly on the
regulators.
Connect the air outlet
external extraction grille.
8
a) if the
80 and the
Ø
3
/h) by their shape (fig. 4).
80) and kitchen
Ø
3
/h valves in the U.K.).
125 to a roof terminal or an
Ø

Extract Ventilation rates

For U.K. Market only:
The product is designed to Comply with U.K. Building
Regulations Approved Document F1: Means of
Ventilation System 3 – Continuous mechanical
extract.
The installation rates are:
Room
high rate
Kitchen
13 l s
Utility room
8 l s
Bathroom
8 l s
Sanity
6 l s
accommodation
** As an alternative for Sanitary accommodation
ONLY. An opening window equal to 1/20th of the floor
area may be used instead.
The whole building ventilation rates are:
Whole building
ventilation rate
a b
(l/s)
a. In addition, the minimum ventilation rate should be
not less than 0.3 l/s per m2 internal floor area (this
includes each floor, e.g. for a two-storey building, add
the ground and first floor areas.
b. This is based on two occupants in the main
bedroom and a single occupant in all other
bedrooms. This should be used as the default value.
If a greater level of occupancy is expected, then add
4 l/s per occupant.
The product should be used in conjunction with
Vortice Flexible Aluminium Ducting or Vortice Rigid
Modular Plastic Ducting.

Typical applications

Fig. 6÷8
Continuous extract
Min
Min low rate
Total extract rate
must be at least
the whole building
ventilation rate
Number of bedrooms
in dwelling
1
2
3
4
13
17
21
25
5
29

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Kit vort pentaKit vort penta oem chantier ep

Tabla de contenido