Descargar Imprimir esta página

Twin-Star International 28MM6240 Manual De Instrucciones Adjunto página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Locate Hearth/Base (A) and set out fi nished side up
on the fl oor.
Insert one Wood Dowel (CC) into each of the
pre-drilled holes.
2 people need to lift assembly into place.
Attach the Completed assembly from step 2 to the
Hearth/Base (A). Make sure that dowels are seated
into the pre-drilled holes in the Hearth/Base. Using
Bolts (AA) and Washers (BB) attach panels through
pre-drilled holes, using Bolts (II) and Washers (BB)
with Allen Wrench (JJ) attach panels through
pre-drilled holes as shown in Fig. 3.
HAND TIGHTEN ONLY.
Hardware Used
AA
Bolt
BB
Washer
CC
Wood Dowel
II
Bolt
JJ
Allen Wrench
4. Connect the plugs of Light Pucks, as right diagram
Fig. 4. The light kit is now ready to be plugged in
to the power source. Touching the light Switch
Activator Knob will turn on or off the piers lights.
5. Insert one Wood Dowel (CC) into each of the
pre-drilled holes on the top edges of the Assembly
from step 4. Attach the Completed assembly from
step 4 to the Center Shelf (I). Make sure that
dowels are seated into the pre-drilled holes in the
Center Shelf. Using Bolts (AA) and Washers (BB)
attach panels through pre-drilled holes.
Secure the wire to the Center Shelf bottom face
using Wire Clip (FF).
Hardware Used
AA
Bolt
BB
Washer
CC
Wood Dowel
EE
Screw
Fig. 3
x 4
x 4
x 8
Fig. 4
x 4
x 1
Fig. 5
CC
x 10
x 10
x 8
x 4
5
CC
A
AA
BB
BB
Light
Pucks
FF
EE
BB
AA
JJ
II
I
CC

Publicidad

loading