Leister MINIFLOOR Instrucciones De Funcionamiento página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Operating readiness
B. Place hot air hand tool (22) in clam-
ping device (16) and tighten with a
clamping screw (2).
Make sure that the hot air hand tool
(22) sits in close alignment with the
clamping device (16).
C. Insert 5 mm tubular nozzle (23),
100.303 and rapid welding nozzle
(24) 105.433 for wire diameter of 4
mm or 105.432 for wire diameter of 3
mm (make sure that the tubular nozzle
and rapid welding nozzle are correctly
aligned).
Caution: Welding with bent tubular
nozzles (24) may lead to poor welding
results!
D.
Connect the hot air hand tool (22) to
the outlet on the MINIFLOOR (18).
E.
Roll up the cable for the hot air
hand tool (22) and attach to the
appropriate openings (8) on the
cover plate (13) with a hook-and-
loop fastener (21).
16
22
2
23
24
8
13
22
18
21
22
17

Publicidad

Tabla de contenido
loading

Tabla de contenido