Maintenance; Switch Replacement - ESAB MT-300GL Instrucciones De Operación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SECTION 4

4.1 SWITCH REPLACEMENT

MT-300GL Gun
Twist handle lock nut in direction of arrow.
Pull handle lock nut away from handle.
Remove switch from pocket in handle.
Remove switch from switch lead connectors with needle nose
pliers.
Push new switch lead connectors firmly onto switch terminals
with needle nose pliers.
Fit new switch into pocket on handle; switch leads must lie
parallel.
Reinstall handle lock nut on hnadle.
MT-400GL and 500GL Gun
STEP #1
Remove both mounting screws with 5/16" nut driver.
Ease switch out of switch housing by gently pulling up
on leads.
Remove switch from switch lead connectors with needle
nose pliers.
MT-400GL and 500GL Gun
STEP #2
Push switch lead connectors firmly onto switch terminals with
needle nose pliers.
Depress switch plunger and nest back into housing.
Fit switch housing into nest on handle (switch leads must
lie parallel).
Align housing holes with threaded holes in body and insert
mounting screws.
Start both screws first before tightening with 5/16" nut driver
to even alignment.
IMPORTANT
Use manufacturers screws to ensure proper length, hardness
and tolerance.
23

MAINTENANCE

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mt-400glMt-500gl

Tabla de contenido