COMPACT 1.4
EN
Assembly
Recommendations
• Before starting assembly, please read instructions
and follow them during installation process.
• Use the adequate tools for each operation.
Electricity
• Disconnect ignition key.
• Disconnect battery before starting assembly.
• Make sure electric components are securely
connected, checking their correct fitting.
!
Warning
If the unit slants during assembly, wait for at least
60 minutes with the unit in horizontal position
before starting it up.
!
Warning
When installing air conditioning equipment on roof, the
upper cabin part must be protected with a cloth or a
protective blanket to avoid possible scratches. When
installing Compact on roof, take into account that,
normally, cabins equipped with a hatch have a strong
enough structure to hold equipment weight. However,
if it is not the case and it is necessary to carry out a
cut in the roof or, although it has a hatch, the material
is not resistant enough (if roof is made of fibre, plastic,
etc...), it is the installer who will have to decide, under
his responsibility, if it is necessary to reinforce the roof
to avoid possible deformations, breaks, water entries,
etc., habilitating the means required to stop it from
occurring.
Torx wrenches set
Allen wrenches set
Open-jawed spanner 13, 25
Scissors
Flexo-meter
Documentation included
Mounting instructions
User's guide
Troubleshooting
Parts list
Fragile
Beware of cuts!
Electrical hazard
!
The installing personnel must have a sufficient
training in vehicles air conditioning.
!
dirna Bergstrom, s. l. shall not be responsible for
breakdowns or damages coming from an inadequate
handling or installation of the equipment or from
modifications and substitutions carried out without
our express and written authorisation.
!
Equipment pre-charged with refrigerating gas.
(Do not handle refrigerating gas circuit).
!
Please see product warranty procedure included in
Troubleshooting.
!
Please see equipment User's Guide for its correct
functioning of the remote control and control panel.
!
Once installation is finished, the following documents
must be handed over to the user: User's Guide,
Warranty and Troubleshooting.
!
The unit does not comply with ADR regulations.
8
Tools
1001199512
1001199491
1001199510
1001199490
Symbology
!
Warnings
®