Fig. 36
CEMENT
CEMENTO
9"
bridge Platform
Plataforma del puente
dditional
nchoring:
Note: These instructions are for anchoring your unit in particularly sandy or otherwise loose soil.
1. Dig (2) holes for the Bridge Platform, (see pg. 29 for placement).
2. Dig (2) holes near the swing beam side of the tower as shown in (Fig. 36a).
3.
ttach (2) 2'' x 4'' x16'' nchor Boards, (not included in kit), on the base of the Tower as shown in (Fig. 36).
4. Pour gravel into each hole to a 6'' depth, as shown in (Fig. 36) and (Fig. 36a).
5. Pour cement into each hole until it is 1'' below the surface as shown in the figures above.
6. Cover the cement with dirt and compact.
nclaje adicional:
Nota: Estas instrucciones son para el anclaje de su unidad en suelo particularmente arenoso o blando.
1. Excave (2) agujeros para la plataforma del puente, (vea la pág. 29 para la colocación).
2. Excave (2) agujeros cerca del lado de la viga del columpio de la torre, como se muestra en la (Fig. 36a).
3. Fije las (2) tablas del anclaje de 2'' x 4'' x 16'', (no se incluyen en el kit), en la base de la torre como se muestra en la (Fig. 36).
4. Vierta gravilla en cada agujero a 6'' de profundidad, como se muestra en la (Fig. 36) y (Fig. 36a).
5. Vierta cemento en cada agujero hasta que esté a 1'' por debajo de la superficie, como se muestra en las figuras anteriores.
6. Cubra el cemento con tierra y compáctela.
ssembly Instructions / Instrucciones de ensamblaje
1"
24"
6"
GRAVEL
GRAVILLA
47
(2) 2-1/2'' Wood Screws Per Joint
Tornillos para madera de 2-1/2'', por junta
24"
6"
GRAVEL
9"
GRAVILLA
Tower
Torre
Fig. 36a
1"
9"