Descargar Imprimir esta página

MoJack 750 XT Instrucciones Para Asamblea Y De La Operación página 8

Ocultar thumbs Ver también para 750 XT:

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 4
Attach the Grip Handle
two Carriage Bolts
and two Nylock Nuts
13
STEP 5
Attach the Crank Handle
Carriage Bolt
with threads facing up and fasten with
13
Nylock Nut
.
15
Note: There are two holes in the Crank Handle. The hole
closest to the rubber grip will provide a 6" radius for crank-
ing. The other hole will provide an 8" radius, making crank-
ing easier. Use the hole that works best with your model of
lawn mower.
STEP 6
Hang the Lift Arm
on the Carrier by hooking
2
the slotted area of the Lift Arm under the top bar
of the Carrier. Lift Arm must be inserted from the
front and then lowered which fastens Lift Arm into
place. Insert Clevis Pin
17
Carrier and lock by fastening the Small Hair Pin
to the Clevis Pin.
Assembly Instructions
to the Tower
with
7
1
.
15
Grip Handle 7
to the Tower
by inserting
8
1
through the hole in the
18
MoJack 750XT Lift
Carriage Bolt 13
Nylock Nut 15
Tower 1
Nylock Nut 15
Carriage Bolt 13
Lift Arm 2
8
Crank Handle 8
1
Top Bar of Carrier
Tower
Carrier
Small
18
Hair Pin
17
Clevis
Pin

Publicidad

loading