Descargar Imprimir esta página

Rev-A-Shelf 5322 Serie Instrucciones De Instalación

Publicidad

Enlaces rápidos

INSTRUCTION SHEET
INSTRUCCIONES DE INSTALACIÓN
DES INSTRUCTIONS D'INSTALLATION
2409 Plantside Dr., Je ersontown, KY 40299
800.626.1126
www.rev-a-shelf.com
TOOLS REQUIRED:
ESTIMATED ASSEMBLY TIME:
CARE AND MAINTENANCE:
TEMPS ESTIMÉ DU MONTAGE:
OUTILS NÉCESSAIRES:
ENTRETIEN ET MAINTENANCE:
HERRAMIENTAS NECESARIAS:
ESTIMAR EL TIEMPO DE MONTAJE:
CUIDADO Y MANTENIMIENTO:
"
Clean with a damp cloth and wipe parts dry.
MIN
Limpie con un trapo húmedo y seque.
Nettoyer avec un chi on humide et essuyer pour
sécher complètement.
Many of our products feature installation videos. Visit Rev-A-Shelf.com for more details.
I-5700-0513

Publicidad

loading

Resumen de contenidos para Rev-A-Shelf 5322 Serie

  • Página 1 Clean with a damp cloth and wipe parts dry. Limpie con un trapo húmedo y seque. Nettoyer avec un chi on humide et essuyer pour sécher complètement. Many of our products feature installation videos. Visit Rev-A-Shelf.com for more details. I-5700-0513...
  • Página 2 Component Check List • Lista para verifi car los componentes • Liste de vérifi cation des composants Description • Descripción • Description 5243/5250 5258 5273 Steel Frame • Marco de metal • Cadre en acier Top Slide • Glisser superior • Coulisse du haut Bottom Slide •...
  • Página 3 FACE FRAME CABINETS Install bottom slide Install top slide Attach feet (#9) to bottom slide (C) using M4 screw (#8) as shown The top slide (B) of the pantry needs to be mounted ush with the in gure 1. To attach the rear foot, the soft-close will need to be face frame.
  • Página 4 Door Mounting The top and bottom of the pantry use the T type door mount To calculate overlay measure the door and then measure the brackets (D). Remove center screw as shown in gure 8, insert cabinet opening. Overlay = door width minus cabinet opening di- bracket and then connect the bracket to the top of the frame with vided by 2.
  • Página 5 Adjustment The rst adjustment is the left to right tilt. By tightening the nal adjustment is top to bottom and tilt. Loosen the front screw and loosening the back screw, the door will tilt out two M6 (#2) screws. Using the 4mm allen wrench (#1), tighten on the left.
  • Página 6 GABINETES SIN MARCOS • ARMOIRES AVEC CADRAGE AVANT Instale el deslizante inferior • Installer la coulisse du bas Instale el deslizante superior • Installer la coulisse du bas Sujete la pata (#9) a la parte inferior del deslizante (#C), utilizando un tornillo M4 (#8) El deslizante superior (B) de la alacena necesita ser montado al ras con como se muestra en la gura número 1.
  • Página 7 Montaje de la Puerta • Montage de la Porte Re érase a la gura 9. El primer paso es calcular la cubierta. Mida la puerta y luego mida la apertura del gabinete. Cubierta = ancho de la puerta menos la La parte superior e inferior de la alacena, utiliza el soporte de montaje para apertura del gabinete, dividido entre 2.
  • Página 8 Ajuste • Réglage El ajuste nal, es de la parte superior a la parte inferior e inclinada. El primer ajuste es la inclinación de la izquierda a la derecha. Re érase a la gura número Re érase a la gura 15. Suelte los dos tornillos M6 (#2). Utilizando una 13.