Installation - Ducasa ALU STONE 1000 Manual De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. INSTALLATION

Colgar el radiador en la pared:
1.
Choose a correct location for the heater. (Figure 1)
2.
Drill top 4 holes on the wall and put the plastic pegs in
the holes. Fix the 2 higher hooks onto the wall with
screws. (Figure 2)
3.
Put the heater bottom up. Hang the 2 bottom
supporters onto the left and right horizontal cyclinder
(left cyclinder between left 1st and 2nd aluminum fin,
right cyclinder between right 1st and 2nd aluminum fin)
(left side picture in Figure 3).
4.
Insert the side without hole of the fixing piece into the
long hole of bottom supporter (right side picture in
Figure 4)
5.
Fix the 2 fixing piece and the 2 bottom supporter with
the 2 short screw provided. (Figure 5)
6.
Hang the heater (using the left hole between left 1st and
2nd aluminum fin, and right hole between right 1st and
2nd aluminum fin) onto the 2 higher hooks. (Figure 6)
7.
Mark the fixing holes for 2 bottom supporters on the
wall. (Figure 7)
8.
Take down the heater and drill 2 bottom holes on the
wall and put the plastic pegs in the holes.(Figure 8)
9.
Hang the heater onto the 2 higher hooks again.
(Figure 9)
10.
Screw tightly the 2 screws of the bottom supporters.
Always be sure that the heater is correctly fixed and
stable after performing the installation! (Figure 10)
25

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Alu stone 1500Alu stone 20000.637.8170.637.8220.637.826

Tabla de contenido