Cable And Hose Strain Relief Device - Husqvarna HTC 5 Serie Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

HTC T5
If the machine feels heavy to operate, it may be due to the placing of the weights. Raise the
weights to position 2 to unload the grinding head. Ensure that the weights are in the same
position on both sides to prevent the risk of uneven grinding.

5.4 Cable and Hose Strain Relief Device

There is a cable and hose strain relief device
located on the rear of the chassis.
32
TIP
If the machine is heavy to operate, it may be due to the placing
of the weights. Fold the weights back to unload the grinding
head.
Operation
D004753, 01.01

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Htc t5

Tabla de contenido