Descargar Imprimir esta página

Kohler K-T10110 Guia De Instalacion página 4

Guarnición de la válvula termostática

Publicidad

Idiomas disponibles

Idiomas disponibles

2. Adjust the Handle Assembly
Ensure the valve stem adapter is lightly placed over the spline
adapter.
Place the handle assembly over the valve stem adapter.
Turn the handle assembly clockwise until the stop is contacted.
The valve will be in the full cold position. The handle should be
between the 9 and 10 o'clock positions.
Rotate the handle assembly counterclockwise, through the detent,
then to the high temperature limit stop.
Verify that the handle assembly is between the 3 and 4 o'clock
position.
Rotate back to 6 o'clock position.
Remove the handle assembly and set aside.
To adjust for handle alignment:
NOTE: The spline adapter allows fine adjustment of the handle
alignment.
Remove the handle assembly and the valve stem adapter.
Reposition the spline adapter.
Reinstall the handle assembly and the valve stem adapter.
Check the alignment. Repeat this procedure until the handle
alignment is satisfactory.
1041503-2-H
Valve
Spline Adapter
Valve Stem
Adapter
Handle
Assembly
4
Kohler Co.

Publicidad

loading