Control; Close File; Log File - Steren NB-2200 Manual De Instrucciones

Ocultar thumbs Ver también para NB-2200:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

It allows to make the following tests on the
UPS:
• Test the UPS for 10 sec.
• Test the UPS for several minutes.
• Test the UPS until that battery is low.
• Cancel UPS test.
• Turn on / off alert tone.
• Shut down the system.
In this section, you can check the closed applications and saved files.
Here you can view the events and the team's data:
• Data log: Data from the UPS, such as the input and output voltage, line
frequency, load, battery capacity and temperature, etc., will be recorded in
this section.
16

7.3 Control

7.4 Close file

7.5 Log file

Publicidad

Capítulos

Tabla de contenido
loading

Productos relacionados para Steren NB-2200

Tabla de contenido