Kohler Sterling 572111 Guía De Instalación Y Cuidado página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2. Secure the Bottom of the Screen
Carefully position the bath screen on the bath ledge and slide the into the wall jamb.
Verify the seal is compressed as shown.
Drill the bottom two 3 mm holes through the wall jamb channel and into the screen frame.
Secure the bottom of the bath screen frame to the wall jamb using the supplied screws.
1280804-2-B
4
Wall Jamb
Channel
Sterling

Publicidad

Tabla de contenido
loading

Tabla de contenido