3. Install the Support Framing
Construct the support framing as illustrated. The 2x2 should be
offset 1-3/16" (30 mm) from the bottom edge of the 2x4s to
support the pressure balancing loop at the proper depth.
Install the support framing under the pressure balancing loop(s).
The bottom of the 2x4s should be flush with the bottom of the
ceiling joists.
Do not strap the pipes.