5. Operating instructions
ATTENTION: For a safety operation the procedures detailed below should be
carried out with the device Powered-Off.
Check if there is no differences of potential voltage between the points where the
equipment shall will be connected to, nor between them and the ground.
1. Connect the red test lead to the 20 kV, 15 kV, 10 kV or 5 kV terminal in
accordance with the desired test voltage.
2. Connect the black test lead to the -R terminal.
RED
TEST LEAD
BLACK
TEST LEAD
The test leads in the drawings are only for illustration.
31