Best IBF4I36SB Manual De Instrucciones página 13

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7. Measure the length of
6" round flexible duct
required from the damper
/ duct connector to the
ductwork rough-in in
the ceiling. Connect the
duct to the damper / duct
connector, secure with
tie wrap and seal with
duct tape.
8. Attach the aluminum
flexible duct to the non-
duct plenum collar. Make
sure non-duct plenum
"front" is facing front of
hood. Secure with tie
wrap and seal with duct
tape.
9. Remove the protective
coating from the inner
the flue. Turn the inner
flue so that the louvers
are at the top. Carefully
slide the inner flue down
into the outer flue. Slide
the flues over the angle
brackets. Make sure the
side marked "front" faces
the control side of the
hood. Feed the power
cable up through the
flues.
10. Pull the inner flue up
and attach the non-duct
plenum with collar to
the upper flue using (4)
M4 x 8mm sheet metal
screws.
11. Attach the hood
assembly to the ceiling
bracket using (8) M4 x
10mm machine screws
(2 for each support leg).
12. Connect power cable to
house wiring. Black to
Black, White to White,
and Green to Green
or Bare wires. Secure
power cable to wiring
box with appropriate
connector.
(4) M4 x 8mm
SHEET METAL
SCREWS
NON-DUCT
PLENUM
FLEXIBLE
DUCT
DAMPER /
DUCT
CONNECTOR
(8) M4 x 10mm
PAN HEAD
MACHINE
SCREWS
- 13 -
INNER
FLUE
F R O N
T
POWER
CABLE
OUTER
FLUE
DUCT
TAPE
F R
O N
T

Publicidad

Tabla de contenido
loading

Tabla de contenido