Kohler K-8034 Guia De Instalacion página 18

Ocultar thumbs Ver también para K-8034:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2x6
Power Data Supply
2x6 Stud Cavity
9. Install the PDS
DANGER: Risk of electrocution. Disconnect the electricity to
the working area at the main breaker panel before performing
the installation steps for hardwiring.
The PDS is designed to fit within a service closet or 2x6 stud
cavity with access panel. The service closet or access panel must
be located less than 30 ft (9.14 m) from the overhead rain panel.
Recommended maximum distance is 25 ft (7.62 m).
If mounting boards are required, they should be positioned to
allow adequate surface area to attach the PDS via the existing
mounting holes on both ends of the PDS box.
Route electrical wire to the service closet or 2x6 stud framing,
within 24" (61 cm) of the PDS. Make sure the wire is in a position
to reach the PDS where electrical connections can be made, and
allow enough wire to create a drip loop.
Orient the PDS box within the service closet or access panel to
allow room for cover removal and connecting the cables. If
possible, connect the cables through the side holes rather than
those on the cover to avoid complicated cover removal for
servicing.
1078520-2-C
Position
to far left.
6" (15.2 cm) Min
Drip Loop
18
Mounting Board
8-1/4" (21 cm)
100-240 VAC
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-8038

Tabla de contenido