6-3/4" (17.2 cm)
Soldering Template
Clamp each tee
to template
during soldering.
3. Install the Supply Piping – Multiple Supplies
Route the water supply lines.
Use the provided soldering template to construct the pressure
balancing loops.
Assemble the pressure balancing loop with a tee positioned over
each of the four raised locations on the soldering template.
Solder the assembly while it is still attached to the soldering
template.
IMPORTANT! To maintain proper positioning of the tees and
ensure alignment with the product, the two pressure balancing loops
must be rigidly connected to each other while still on the soldering
template.
While still on the soldering template, rigidly connect the two
pressure balancing loops to each other.
Remove the pressure balancing loop assembly from the soldering
template.
Connect the pressure balancing loops to the water supplies.
Kohler Co.
9-5/8"
(24.4 cm) D.
6-3/4"
(17.2 cm)
1/2" NPT Nipple
Rigidly connect
to each other.
9
Pressure
Balancing
Loops
Soldering
Template
1078520-2-C