Notch Sentinel Manual Del Usuario página 5

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

REPLACEMENT OF ROPE BRIDGE:
Replacement rope bridges are supplied separately and include
detailed replacement instructions to be used when replacing
worn bridge. Use only replacement Notch™ bridge
(manufactured from approved arborist climbing rope) supplied
by Notch Equipment. Replace suspension bridge if protective
cover of stitching (shrink tube) is damaged, missing or torn.
Ring
TYING THE ROPE BRIDGE STOPPER KNOT:
This stopper knot is recommended by the rope manufacturer
to secure the replacement Notch™ rope bridge. It stops the
rope from passing thought the hole in the bridge anchor plate.
The knots should be hand-tightened to prevent any possibility
of movement/slippage.
Pass the free rope end from the outside to the inside of one
anchor plate, placing the knotted on the outside of the rigging
plate, using the center hole, pass it through the ring, then
through the center hole of the opposite anchor plate, from
inside to outside.
Finish by tying the Double Fisherman's knot on the outside of
the anchor plate with a tail, with minimum of 3 inches in length.
Construct the knot as shown on the right side.
After attaching the replacement rope bridge to the harness,
varify knot stability in a hanging test (user weight) in a non-fall
environment.
Stopp Bartack
Rigging
Plate
Double Fishermen's
knot
transparent Shrinking
Tube
black Shrinked Label
Label
80 mm ≈ 3 in

Publicidad

Tabla de contenido
loading

Productos relacionados para Notch Sentinel

Este manual también es adecuado para:

71-448-01

Tabla de contenido