6
Commissioning
After positioning the appliance it is necessary to perform the following operations:
6.1
Assembly of deflectors and O
RING (in configurations where it is required)
2
• Open the door.
• Make sure that the flue inspection valve is in the closed position with the rod positioned in the appropriate
bracket (Fig. 6.1).
RING as shown in the diagram (Fig. 6.1a - Fig. 6.1b).
• Insert in sequence the deflectors and O
2
Fig. 6.1
Fig. 6.1a
230 mm
Fig. 6.1b
Product images are purely indicative
34
cod. 004777520 - 21/03/2019 - Palazzetti - PN - Italy