STEP 19
Rotate Crank Handle to Storage position
• Push in side of handle and rotate from operating position to the
storage position. Allow to seat into the locked position.
STEP 20
Moving the Tower Assembly to Storage position
• Remove Hair Pin and Clevis Pin from bottom of Tower Assembly.
• Raise the Tower out of the Base by pulling up on the Lift Handle.
• Rotate Tower Assembly 180 degrees and lower into storage position.
• Secure the Tower by inserting Clevis Pin and Hair Pin to lock
Tower Assembly in storage position.
THE LIFT IS NOW READY FOR STORAGE OR TRANSPORT.
Clevis Pin
Clevis Pin
ENGLISH
Tower Assembly
Hair Pin
Hair Pin
17