Assembly And Installation 4.ASsembly And Installation 9 - ITC ECOFERTIC Manual Del Usuario

Tabla de contenido

Publicidad

4. ASSEMBLY AND INSTALLA TION
4. ASSEMBLY AND INSTALLA TION
GB
Set the injection pump ECOFERTIC on the ground on a horizontal stand.
Set the injection pump ECOFERTIC on the ground on a horizontal stand.
Put two inlets (A) and (B) in the water network where the pump is going to be
located at a minimum distance of 0.25 m. (0.75 ft) from each other.
Pressure inlet (C) Connect the flexible pressure inlet hose (A) to the pump
connector (C) inserting a 120 mesh line filter.
connector (C) inserting a 120 mesh line filter.
Fertilizer injection (F) From the pump connector (F) put the flexible injection hose
at the irrigation network inlet (B).
at the irrigation network inlet (B).
Fertilizer suction (E) It is necessary to put a 120 mesh filter.
Drainage (D) Connect the free drainage hose to the outside or to the suction of the
irrigation pump.
irrigation pump.
F
F
E
E
C
C
D
D
IMPORTANT
IMPORTANT
It is advisable to put plastic ball valves at the water inlet (A) fertilizer injection (B)
and fertilizer suction (E) for the maintenance of the pump.
Fertilizer should not be sucked from de tank bottom to avoid taking up non dissolute
particles.
The ECOFERTIC pump keeps the injection liquid flow open even when it is stop,
which may produce a siphon effect. It is therefore suggested that, should it be
necessary, an antisiphon valve be set between the injection inlet (B) and the pump
connector (F) at 0.5 m. (1.5 ft) above the fertilizer tank.
RESET Should the pump not start the first time, the reset button should be pushed
down firmly.
9
9

Publicidad

Tabla de contenido
loading

Tabla de contenido