ZSB−1/8
7
Operation
Warning
Unintentional actuation of the valves or incorrect functioning can cause serious
injury.
S In order to be sure that the product is functioning correctly, check it every
month at a pressure of max. 2.8 bar with an upstream switched pressure
sequence valve.
The two−hand control unit must not switch.
Checking the functional reliability
Keep a record of the monthly checks in your documents.
S
At a medium temperature less than +1 C
Use dried compressed air.
S
You will then prevent the condensed water from freezing.
8
Dismantling and repairs
Dismantling
Exhaust the complete system and the product.
S
Repairs
Do not overhaul the two−hand control unit yourself. Send it to the Festo repair
S
service.
Festo ZSB−1/8 0701NH English
19