Step 1:
Install meter pillars
1. Let the communication line pass through the right meter pillar.
2. Put meter pillars on the base frame. First, use 2 Screw M8*20 and 2 washers;
second, use 4 Screw M8*60, 4 washers and 4 nuts to fasten meter pillars. (Don't
tighten screws at first)
Step 2:
Install meter support
1.
Connect the communication line carefully.
2.
Use 6 Screw M8*20, 6 washers to fasten meter support. (Don't tighten screws at
first)
7. INSTALLATION
Screw M8*20
Whasher
Screw M8*60
Nut
Screw M8*20
Whasher
49