Thermal insulating process
• After checking the draining, wrap the supplied thermal insulation material for the drain connecting part around the
flexible hose leaving no clearance from the root of the drain pipe connecting port of the indoor unit.
• Wrap the thermal insulation material (procured locally) around the drain pipe so that it piles up on the supplied
the thermal insulation material for the drain connecting part, leaving no clearance.
Flexible hose
Hose band
Attached heat insulator Heat insulator to be
procured locally
Hard vinyl chloride pipe
Check panel
Insert the leading part of the
hose between the heat
exchanger and the drain pan,
and then bend it downward.
Polyethylene hand pump for
pouring water in drain pan
Ensure water is poured slowly.
If water is poured vigorously, it is scattered inside of
the indoor unit resulting in a cause of unit trouble.
Air
discharge area
Drain pan
Vessel
Water (1500cc to 2000cc)
12
CAUTION