Prepare The Site - Kohler K-100 Guía De Instalación Y Cuidado

Ocultar thumbs Ver también para K-100:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

For Wall-Mount Faucet Installations
Position the rough plumbing.
Verify that the subfloor offers adequate support, and is flat and level.

1. Prepare the Site

NOTICE: Measure your product for site preparation. Visit the
product page at www.kohler.com for more information.
NOTE: This bath can be used with a wall-mount faucet or
freestanding faucet. Refer to the installation instructions packed with
the faucet for proper placement of the faucet and bath.
Flooring
Provide adequate floor support.
NOTICE: To ensure a successful installation, it is critical that the
bath be installed on a level subfloor.
Verify the subfloor is level. Adjust for level, if necessary.
Apply water-resistant sealant to the subfloor. This will reduce the
risk of water damage.
Framing – For Wall-Mount Faucet Installations
NOTICE: Take into account the thickness of the finished wall
materials when constructing the framing. If these factors are not
taken into account, the bath will not fit in the installation area.
Construct the framing with 2x4 or 2x6 studs.
Plumbing
Position the plumbing.
Kohler Co.
3
1084218-2-C

Publicidad

Tabla de contenido
loading

Tabla de contenido