Maintenance performed by the A.A.C.
ATTENTION:
During the first lighting it is necessary to
ventilate the environment well, since dur-
ing the first hours of operation unpleas-
ant odours could develop due to fumes
from the paint and the grease in the
tuyère wrapping.
If during the normal operation of the stove,
the temperature of the smoke reaches 220°C
(parameter which can be modified by a tech-
nician) the smoke is modulated as follows:
• Smoke removal motor set at the maximum
speed;
• Pellet loading gear motor at the minimum
speed;
• Tangential heat exchange fan at the maxi-
mum speed.
This procedure functions to lower the temper-
ature of the smoke. When this returns below
the level of 220°C the stove will restore the
speed of the three motors returning them to
the settings before the level was passed.
If the electrical current cuts out, once it is
restored, the display will indicate a state of
anomaly and will read "Fire cool" (flame pres-
ent). The suction will be increased to expel
the residual smoke.
Pictures are indicative and can differ from the original product.
Pictures are an example to understand how the product works
Operations to be performed by the
Authorized Assistance Centre every sea-
son before the lighting.
• A general cleaning inside and outside.
• A careful cleaning of the exchange tubes.
• A careful cleaning and disincrustation of the
crucible and the relative cavity.
• Clean the motors, checking the play and
fastenings of the mechanisms.
• Clean the smoke channel (substitute the
tube gaskets) and smoke extractor fan
cavity.
• Clean pressure switch, sostitute silicone
tube.
• Check the probe.
• Replace the batteries in the clock on the
electronic board.
• Clean, inspect and disincrust the lighting
resistor compartment, replacing it if neces-
sary.
• Clean/check the synoptic panel.
• Visually inspect the electrical cables, the
connections and the electrical power cable.
• Clean the pellet container and verify the
play with the screw feeder gear motor.
• Replace the door seals.
• Test functions, loading the screw feeder,
lighting, 10 minutes of operation and shut
down.
• Check the electrical parts and the electronic
components.
• Check and possible cleaning of the canali-
sation.
11