Duct Cover Installation; Final Assembly - KOBE IS-124 Serie Instrucciones De Instalación Y Manual De Operación

Ocultar thumbs Ver también para IS-124 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Duct Cover Installation

11. Slide the inner duct cover up and secure to
the telescopic stack with four (ST 3 x 15)
screws (provided). Refer to Figure 7.
12. With assistance, slide the outer duct cover
to the blower unit and ask assistant to hold
steady until step 15 is completed.
13. Attach glass canopy with LCD screen
underneath the blower unit.
blower unit is inside the housing connector.
Refer to the PARTS LIST on pages 14.
14. Secure the housing connector to the blower
unit with eight (M5 x 15) screws (provided)
as shown in Figure 8.
15. Ask assistant to slide outer duct cover
downward so it rest within the grooves of
the glass canopy.
Connection to LCD Screen
6$)(7< :$51,1*
RISK OF ELECTRICAL SHOCK.
RANGE
HOOD
MUST
GROUNDED.
MAKE SURE THIS IS DONE
BY
QUALIFIED
ACCORDANCE
WITH
NATIONAL
AND
CODES.
BEFORE CONNECTING WIRES,
SWITCH POWER OFF AT SERVICE PANEL
AND LOCK SERVICE PANEL TO PREVENT
POWER
FROM
BEING
ACCIDENTALLY.
16. Remove front baffle filter (directly behind
LCD screen). When facing the LCD screen,
turn knobs slightly to left to release baffle
filter. CAUTION: DO NOT OVERTURN
KNOBS.
17. Connect the wires according to connector
color to the blower unit.
18. Place baffle filters back in place.

Final Assembly

19. Turn power ON in control panel. Check all
lights and fan operation.
20. Make sure to leave this manual for the
homeowner.
Make sure
THIS
BE
PROPERLY
ELECTRICIAN
ALL
APPLICABLE
LOCAL
ELECTRICAL
SWITCHED
Figure 7
Figure 8
IN
ON
7

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Is2436gsbIs2442gsb

Tabla de contenido