Mounting information
The drive set is fully configured ex factory.The drives
must be reconfigured using SCS in the event of
changes to the ex-factory configuration
(e.g. when removing a drive from
existing set or integrating
a new drive).
Slave 1
At vertical active pulling application (e.g. for a
skylight) the forces must be rearranged by software
SCS.
Pin Assignment
(GN) green
(YE)
yellow
(OG) orange
(BN)
brown
(BK)
black
(WH) white
(GY)
grey
(PK)
pink
8/20
CDC 200/350(-SBD)-BSY+
Mount the drives whilst
under zero stress.
With that, an even
load distribution is
provided by all
the drive chains.
If after mounting, the distance X is greater than
23 mm, null balance with software SCS is
neccesary. Closure Ranges will shift in relation
to new zero point.
OG (n.c.)
GN (Data b)
YE (Data a)
BN (Mot. b)
WH (Mot. a)
GY (-SGI / SKS / SA / SZ)
PK (+SGI / SKS
GN (Data b)
YE (Data a)
BN (Mot. b)
WH (Mot. a)
English
Slave 1
Slave 2
Master 3
≥ 23 mm ?
X
GY (BRV)
OG (n.c.)
GN (Data b)
YE (Data a)
BN (Mot. b)
WH (Mot. a)
/ SA / SZ
)
99.823.67 2.5/11/13