4 .0
Preparation for Operation
4.1
Operational Preparations
The power supply is carried out via the enclosed battery.
4.2
Inserting the battery
Prior to commissioning, insert the battery. For this
purpose it is imperative that the user complies with
the references described in paragraph 4.3 regarding
battery handling!
Remove the casing rear
Connect the battery supplied by respecting the polarity to the battery clip and
insert it.
Replace the three casing screws and retighten them.
5.0
Carrying out measurements
5.1
Operation Elements an Connections
Bild Lantest 50 -01
26
RJ45
5
4
3
2
1/2
3/6
4/5
PAIRS TEST
1
TEST
FAULTS
STATUS
= OPEN
= SHORT
= REVERSED
7
= LOW
BATTERY
= SPLIT
PAIRS
= CROSSED
PAIRS
6
8
7/8
1
9
a
9
9
b