FAUCET INSTALLATION
Insert the mounting box through the
wall and connect the water supply
pipe (not supplied) to the nipple
5
at the bottom of the mounting box
(make sure it is connected to the
water inlet).
Mount the product base with the
support through the wall opening, and
secure the base support to the two
6
small holes using 2 screws. make sure
that the base is leveled to the center.
IMPORTANT: The product base should be
installed so that the outside surface of the
finished wall falls between the minimum and
maximum lines marked at the base.
Assemble the rigid pipe (not
7
supplied) from the nipple at the box
to the inlet at the product base.
10
QUADRAT 2030 B / 2030 E
QUADRAT BOX
MAX
MIN
FAUCET INSTALLATION
Assemble the corrugated tube with
the connectors between the product
8
base and the box.
Pull the power supply wires
(transformer/battery) and sensor
9
cable out of the product base.
Assemble the mud guard cover and
temporary cover to the mounting box
and base accordingly.
10
NOTE: the MIN and MAX marks on the
box
QUADRAT 2030 B / 2030 E
11