Tabla de contenido

Publicidad

1.7 Operation Test

 Connect your computer equipment with sockets of the UPS, then connect the UPS
to the wall receptacle.
 Press the UPS On/OFF [
twice, the UPS will be start-up.
 [Battery Test]: Pull off the input power cable of the UPS from the wall receptacle.
Meanwhile, please check if alarm buzzer is beeping (every 30 seconds).
 Try the field working condition by running some application programs on your
computer and repeating step.
 Check if the UPS is initiated properly to support continuous operation.
Connect to Utility and Charging
Plug in the AC input cord to the wall outlet. For the best
results, suggest to charge the battery at least 10 hours
before initial use. The unit charges its battery while
connecting to the utility.
] Switch for approx. 3 seconds, then the Buzzer sounds
Your new UPS may be used immediately upon receipt.
However, recharging the battery for at least 8/10 hours
is recommended to ensure that the battery's maximum
charge capacity is achieved. Charge loss may occur
during shipping and storage. To recharge the battery,
simply leave the unit plugged into an AC outlet. The unit
will charge in both the on and off position.
This LED Display is illuminated for few seconds when the
UPS is working (then automatically the display will be
deactivated, press the button [
reactivate the display).
24
] for some seconds for
ENG

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

A03-s1200Onepower 1000

Tabla de contenido