INSTALLATION PROcEduRE, cONT.
3
Level and mark all sides. Front apron should be firmly on the floor.
5
Install drain assembly per manufacturer's instructions. If desired, spread
foundation material. When using foundation materials, the following
applies: Mix foundation material. Place three or four mounds of plaster
on the subfloor around but away from drain hole. The mounds should be
placed high enough so that when the unit is set, it will cause the plaster
to displace and spread.
7
Tap down until level. Level lengthwise and widthwise using 3 ft. (915mm)
level by shimming or depressing foundation materials. The unit must be
set level.
Aquatic • 8101 E. Kaiser Blvd. • Anaheim, CA 92808 • (800) 877-2005 • FAX (714) 998-5340 • www.aquaticbath.com
Installation Instructions
4
Remove tub.
6
Place base into framing pocket.
8
Pre-drill horizontal flanges along top of base section and fasten into each
corresponding stud. Pre-drill both (vertical) side flanges and fasten to side
studs 8" (200mm) on center. Place cardboard to protect finish.
— 3 —
A
Composite Tub Models
2
Fax on Demand # 1361