d.
Install Left Door (L) and Right Door (K) into hinge openings
of Front Floor (A) and hinge sockets in Front Roof (J).
Note: Only raise front edge of roof enough to install the
door hinge pins.
J
L
L
A
5.0 Finishing Installation
a.
Install Screws (AA) into 6 locations shown at bottom of wall panels to secure walls to floor.
HELPFUL HINT: Pilot holes may be drilled for the screws.
CAUTION: Do not overtighten screws.
J
K
K
A
e.
From inside the shed, install four Screws (AA) into the roof,
two on each side wall.
Note: The screws also have to go through the Roof Brace
(RB) at each end to properly secure the roof!
A second person on the outside of the shed should hold
down the edge of the roof firmly at each screw location.
J
AA
(4)
RB
AA
(6)
11