Installation; Preparation For Mounting - HAMPTON BAY BPT12-13D Guía De Uso Y Mantenimiento

Ventilador
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation

1

Preparation for mounting

Determine thickness of finished ceiling board
(* measurement shown).
Place main body (A) against ceiling joist in desired
location.
Ensure bottom of main body (A) hangs down below
joist to account for finished ceiling board.
NOTE: For example, if thickness of finished ceiling board
is 3/4 in. then main body (A) should hang down from joist
3/4 in.
2
Mounting fan body
Use long wood screws (BB) to loosely attach both sides
of main body to joist (right side shown).
Ensure ventilation fan is level and that proper clearance
is given for finished ceiling board.
When main body (A) is level and in the intended
location, tighten screws (BB) on both right and left
side of main body (A).
7
Please contact 1-877-527-0313 for further assistance.
www.hamptonbay.com

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

317-768

Tabla de contenido