10. Connect the white neutral wire to the neutral bus bar and
torque to 35 inch lbs. The torque values are:
• 10-14 AWG = 35 in/lbs
• 8 AWG = 40 in/lbs
• 4-6 AWG = 45 in/lbs
11. Connect the control wires to the correct terminals. The
terminals are clearly marked N1 and N2 for utility sensing; 23
and 194 for transfer relay control; and T1 and 0 for battery
charge. On pre-wired switches, the 0 (zero) wire will not be
present/required.
In order to maintain separation of circuits, the DC control wires
must be separated from the AC control wires. A piece of fiber-
glass sleeving has been provided in the manual kit to achieve
this. Slide the sleeving over the AC wires OR the DC wires, but
not both, from the wire landing area to the outside of the gen-
erator. Use the cable tie locations to hold the sleeving in place.
12. An improperly connected control wire can damage the
generator control board.
Neutral
Ground
Cable Tie Location
NOTE:
APPENDIX A – EZ SWITCH INSTALLATION &
OPERATIONAL TESTING
1. Before beginning any installation, make sure power is shut
OFF to the main distribution panel and carefully read the
Owner's Manual that came with the transfer switch.
The distributed load center switch must be mounted close
enough to the main distribution panel to accommodate the
two-foot, pre-wired conduit. Make sure no water or corrosive
substances can drip onto the transfer switch enclosure.
2. Always inspect the switch for shipping damage. Never mount
a transfer switch that shows any evidence of damage.