REMOVE THE PACKAGING
CAUTION
Wear gloves to protect against sharp
edges.
The vent hood is shipped secured to a shipping board
with 4 screws.
■ Remove the duct cover, parts box and foam
packaging.
■ Lift the hood out of the box.
■ Remove and properly discard the plastic wrapping.
■ Remove metal grease filters and side bar packaging.
Shipping board
CHECK INSTALLATION HARDWARE
Locate the hardware accessory box packed with the
hood and check contents.
10 wood
10 metal wall
658Dia37
screws
fasteners
658Dia38
Duct cover bracket (not required
for recirculating operation)
NOTE: Additional tools, materials and hardware are required to
construct your wall framing support.
31-10724-7
Installation Preparation
Mounting screw
2 Mounting brackets
658Dia35
2 Large
flat washers
658Dia9
2 Phillips-head
Decorative
duct cover
duct covers
screws
■ To remove the shipping board, locate and remove 2
screws at the top of the assembly and 2 screws inside
the hood behind the filter guides on the left and right
sides. Discard the shipping board.
Junction box
Mounting screw
■ Remove junction box cover.
■ Remove knockout from junction box.
■ Install strain relief onto junction box.
• Drill 1/8" Pilot Holes For Mounting Brackets.
5-7/8"
17-5/16"
C L
• Drill 1/8" Pilot Holes.
• Drill 1/8" Pilot Holes.
Align edge 25-1/2" above Cooking Surface.
Wall-mount template
2 Utensil rods with 4 machine screws
Additional Parts for Recirculation Operation
658Dia16
Air deflector with upper
duct connector
Knockout
Mounting
screw
Shipping board
3 Stainless
steel grease
filters
658Dia52
3 charcoal filters
658Dia53
7