Quick start guide
Era Mat MO
1 - Electrical connections
1
2
3
4
5
6
2 - Memorisation of the FIRST transmitter
01
OFF
Turn OFF
3 - Adjust limit switches "0" and "1" in MANUAL mode
01
5
sec.
Press until...
Upper limit
switch "0"
03
Press until...
Lower limit
switch "1"
Press until...
4 - Total deletion of memory
01
5
sec.
Press until...
04
5
sec.
Press until...
Movements (no. 3)
Note – During the procedure, you can abort the program at any time, by allowing 30 seconds to elapse between key presses.
IS0130A01MM_17-02-2017
tubular motor for adjustable
slat shutters
- ref. Chapter 4
Com.
L
N
ON
2
sec.
Wait
Turn ON
02
2
Movements (no.2)
Release
Press until...
2
5
sec.
Movements (no.2) Release
2
5
sec.
Movements (no.2) Release
- ref. procedure E.1
02
2
Movements (no. 2)
Release
Press until...
3
Release
Note for reading this Guide • In this
Quick Start Guide, the numbering of the
figures is separate and does not cor-
respond to the numbering cited in the
complete manual. • This guide does not
substitute the complete manual.
Cable Colour
1
White-orange
2
White
3
White-black
4
Brown
5
Blue
6
Yellow-green
- ref. procedure A
02
2
Movements (no. 2)
Press until...
- ref. procedure B.1 - B.2
4
5
sec.
Movements (no.4)
Release
"0"
The chosen limit switch "0"
"1"
The chosen limit switch "1"
3
5
sec.
Movements (no. 3)
Release
05
all
data
5
sec.
Press together until ...
Connection
Clockwise rotation pushbutton
Counter-clockwise rotation pushbutton / TTBus
Common (for bus wires)
Supply phase
Neutral
Earth
3
5
sec.
Movements (no. 3)
You can adjust whiche-
ver limit switch you want
as the first limit switch.
Repeat the procedure to
memorise the other limit
switch.
04
3
5
sec.
Press until...
Movements (no.3) Release
03
3
5
sec.
Press until...
Movements (no. 3)
5
Movements (no. 5)
Release together
THE
END
END
Release
THE
END
END
Release
THE
END
END