Assemble FRONT HANDLE Assembly to the GRILL LID (55) in detail 9-A.
Assemble two GUARDS (42b), COOKING GRIDS (63), GRIDDLE (64) and
Step
WARMING RACK (65). See detail 9-B and 9-C.
9
58
60
DT
AO
AO
9-A
55
AO
9-A. The FRONT HANDLE (58), HANDLE SPACER (60),
HANDLE INSULATOR (59), four screws (DT) and four
hex nuts (AO) are PRE-ASSEMBLED at the factory.
Remove the four hex nuts (AO) from the Handle
assembly.
Insert the screws in the Handle assembly into the
GRILL LID (55) and secure with four hex nuts (AO).
Tighten with adjustable wrench or 7/16" wrench.
DT
59
AO AO
AO
1
42b
Hardware shown actual size
(4) Qty.
(4) Qty.
65
63
9-B. Place two GUARDS (42b) on the front lip of the Bottom
Casting (see fig. 1). Align the clip over grid lugs. Place the
COOKING GRIDS (63) in the Bottom casting with the
smooth surface down.
Set the WARMING RACK (65) near the back of the bottom
casting.
64
63
9-C. Optional Cooking Surface. Remove one of the cooking
grids (63) and place the GRIDDLE (64) in the Bottom
Casting.
9-B
63
63
9-C
63
(Pg. 11)