Step Four
Unpack the pebbles from the bag and place them along the light unit in the desired position.
Please note the pebbles are located in the side of the polystyrene packaging.
Step Five
Place the front frame over the front of the fireplace aligning the slots in the bracket at each side
of the glass panel with the knobs on the sides of the fire (see figure below). Two people will be
required for this operation.
Instructions for Use
This fireplace can be operated either by the switches located on the top right hand side of the
fireplace or the supplied remote control.
↓
7