Bond 6103P Manual Del Propietário página 6

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY
*Please keep the owner's manual for future reference
*If you have opened the carton and removed all packages, please disregard the STEP 1
STEP 1
Unpack and identify all parts using the parts list provided
STEP 2
Installing 1 lb propane tank
(1) Remove the door.
(2) Check each part before using the
product. Make sure the gas supply
system is turned "OFF" before
assembling.
(3) Take the propane tank and insert into
the body.
(4) Install 1lb propane tank onto the
regulator. Turn clockwise until hand
tight.
(5) Perform a leak test. See "Leak Test"
section.
(6) Replace the door.
STEP 3
(1) Place the lava rocks (0.6 kgs) evenly
in the firebowl on the top of the burner.
Ensure the burner is completely
covered. Keep the screen and glass
supports clear of lava rocks. Always
keep the screen visible. See warning
and picture below.
STEP 4
(1) Insert the glass onto the supports in
the body.
(2) Locate the battery and remove the
plastic cover first. Unscrew the rubber
cap of the Electric Igniter, place an
AAA battery into the battery case.
Make sure the positive pole ("+") is
towards the cap. Screw the cap back
to the battery case tightly.
INSTRUCTIONS_______________________
and see the STEP 2 directly.
6

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

67316

Tabla de contenido