Descargar Imprimir esta página

Optimate MILENCO 20 TM264 Modo De Empleo página 4

Cargador de diagnóstico automático para baterías de plomo ácido de 12 v.

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 11
STEP 1
Low Volt
START -
Bat ≥ 0.5V
STEP 2
Pulse
wake up
2
5
STEP 3
TEST
4
before
charge
3
a
1b
2
1a
1b
2
5
4
1a
1b
2
3
WER SUPPLY
ct
-TOUCH
STEP 4
econds when
ADVANCED
y is connected.
SAVE
DC POWER SUPPLY
Select
-TOUCH
for 5 seconds when
battery is connected.
°t
STEP 5
PULSE
DC POWER SUPPLY
SAVE
Select
-TOUCH
1a
for 5 seconds when
1b
battery is connected.
12V
24V
STEP 6
CHARGE
12V
5A
24V
2.5A
4
V
FLASHING
LED #8
6
7
8
TEST
TEST LEDs
6 : GREEN
7 : YELLOW
8 : RED
6
7
8
TEST
7
8
TEST
5
7
8
LED #3 : RED
4
TEST
3
5
4
LED #3 : RED
3
°t
6
7
2
8
LED #4 : YELLOW
TEST
4
°t
°t
STD: Battery voltage check - Milenco 20 automatically activates if
connected battery voltage is at least 0.5 Volt.
Batteries measuring below 2 Volts at connection will proceed to
STEP 2 for 'Pulse wake up' that includes a battery short circuit test.
Batteries measuring 2 Volts or more will proceed directly to STEP 3.
Pulse wake up - LED #8 (red) flashing:
see if the battery is recoverable.
Once the voltage holds above 2 Volts and no short circuit has been detected the
program will commence to STEP 3.
If flashing continues the following conditions may prevent the charge program from
progressing:
1) Vehicle circuitry remains connected to the battery.
NOTE: If the battery under charge is in a low voltage or suphated state,
for the most effective charge and test results disconnect the battery
from the vehicle circuitry and then charge.
2) Battery has multiple short circuited cells. The battery has permanent damage and
should be replaced.
TEST LEDs #6/7/8 indicate the battery condition prior to charging. Consult the table
below to match TEST LED indication to an estimated state of charge percentage
(SOC%). Charging commences after 10 seconds.
AGM
0
20
8
8
STD
0
40
6
Decisions made during the test:
Charge voltage during STEP 6 and 7 is adjusted according to the measured ambient
temperature.
STEP 7 OPTIMIZE minimum charge time is set according to the test result, varying
between 10 minutes for a battery with 80% or higher state of charge to 120 minutes for
a battery with 40% or less state of charge.
6
Severity of discharge is determined; a battery with 60% or more charge progresses
directly to STEP 6 where-as a severely discharged battery progresses to STEP 4 and 5.
Severely discharged batteries will undergo a longer test (up to 12 hours) during STEP 8.
Engages if the battery was diagnosed as sulphated,
unable to accept or hold charge.
Charge time: maximum 2 hours.
Output voltage increases to a maximum of 22V with current limited to 0.4A, but only if
no vehicle electronics have been detected, otherwise it moves directly to STEP 5.
IMPORTANT: Read section VERY FLAT NEGLECTED BATTERIES below.
Engages if the battery state of charge was 40% or less OR
battery has sufficiently recovered during ADVANCED SAVE.
CHARGE TIME : min 15 minutes, max. 2 hours.
Current is delivered in pulses to prepare the battery to accept normal charge.
This step is particularly effective for recovery of factory activated / "hi‑performance"
pure lead or cyclic cell AGM batteries.
Engages if the battery state of charge was 50% or higher (as tested in
STEP 3) or once the battery has been sufficiently recovered during STEP 5.
The ampmatic™ charge current monitoring and control program automatically
determines the most efficient rate of charge current for the connected battery,
according to its state of charge, state of health, and electrical storage capacity.
Milenco 20 is injecting a test signal to
40
60
7
7
60
80
80
100%
6
6
7
100%

Publicidad

loading

Este manual también es adecuado para:

Milenco 20 tm26655245333