ETI Solid State Lighting ST-2-9-840-SV-N Guía De Uso Y Cuidado página 6

Barras de luz led enlazables
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

surface Mounting (continued)
3
Removing one of the knock outs in the fixture
□ Hold the fixture body (B) up to the mounting surface to determine which knock out hole to use for wiring the fixture.
□ Mark two keyhole locations on the mounting surface.
□ Using a screwdriver, punch out one of the three large knock out holes in the fixture body (B) for wiring, based on the installation
position.
4
Preparing to mount the fixture
□ Drill a 1/8-in. pilot hole into the screw locations marked on the ceiling. You can also use an awl or nail to dimple the screw holes.
□ Install a drywall anchor (BB) and a mounting screw (AA) in each drilled mounting hole, but do not tighten fully.
BB
Knock Out Holes
AA
Keyholes
Keyholes
6
Knock Out Holes
AA
B
B

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

St-4-18-840-sv-n

Tabla de contenido